Vertical clearance
67 ft
Atlantic Intracoastal Waterway · Mile
1134.1
Type
Fixed
Datum
MHW
Clearances are published at Mean High Water. Tide, wind, waves and lake level change what is really there.
“The highway bridge crossing the creek at Cross Key, Mile 1134.1, has a fixed span with a clearance of 67 feet.”The creek
Coast Pilot 4 has the waterway enter Jewfish Creek at Mile 1132.8, near the south end of Barnes Sound, before this bridge.
Datum
Coast Pilot 4 chapter 12 does not restate a datum for this bridge clearance; chapter 1 gives cable clearances for the lowest wires at vertical datum, usually mean high water.
Sources & checks
- NOAA U.S. Coast Pilot 4, 2026 (58th) Edition, Chapter 12 – Intracoastal Waterway · 18 Oct 2026
- NOAA U.S. Coast Pilot 4, 2026 (58th) Edition, Chapter 1 – Bridge and Cable Clearances · 18 Oct 2026
Written by buoya editorial from the sources above. Every figure was checked against its source on 21 Oct 2026. Found something wrong? Report a correction.