Bridge · Okeechobee Waterway

Caloosahatchee Bridge (U.S. Route 41)

Last checked 21 Oct 2026
Vertical clearance
55 ft
At the main channel.
Okeechobee Waterway · Mile
About 0.5 mile southwest of the Edison Memorial Bridge
Type
Fixed
Datum
MHW

Clearances are published at Mean High Water. Tide, wind, waves and lake level change what is really there.

“has a fixed span with a clearance of 55 feet at the main channel”
NOAA U.S. Coast Pilot 4, 2026 (58th) Edition, Chapter 12 – Intracoastal Waterway

No mile given

Coast Pilot 4 locates this bridge only as crossing the Caloosahatchee River about 0.5 mile southwest of the Edison Memorial Bridge, without a waterway mile.

Datum

Coast Pilot 4 chapter 12 does not restate a datum for this bridge clearance; chapter 1 gives cable clearances for the lowest wires at vertical datum, usually mean high water.

Sources & checks

Written by buoya editorial from the sources above. Every figure was checked against its source on 21 Oct 2026. Found something wrong? Report a correction.